Friday, October 26, 2007

The Price we pay to drill

So the other day I decided to let the girls in on my house fixing adventures. This time i was working on the landscaping timber for the front yard. If your wondering where i am in the process let me tell you.
I began with Looking at and determining that the wood was rotten and needed to be replaced.
Next I bought the new landscaping timber (only 3 logs the first time, cuz i mis-estimated) it turned out to need 9 logs.
Next i tore out the old logs.
Then i measured the garden and determined how long i needed to trim the logs to in order for them to fit.
Next i measured where the re-bar was and marked on the landscaping timber where to put the holes.
HERE WE ARE IN THE PROCESS.
I was going to allow the girls to drill some of the holes in the timber so i put my 12V drill cordless drill on one of the holes and told the girl to go at it. Well she made it about 1/2 through the timber and the drill died. I figured out my cordless rechargeable drill was not going to survive the 27 holes that needed to be drilled if it could not survive through 1.

To Make a long story short i decided i needed a corded drill. I went next door to the hardware store and told them the size i needed and they were anything but helpful. So i decided to walk to the Ace Hardware down the street. I thought it was about 9 blocks down so i decided to get some excersie and walk. I invited the girls to come with me, told Sarah, and off we went. 2 miles and about 30 blocks later we were at ACE (3535 Magazine). 4 miles total walked and not enough time left in the day to drill the holes. But don't worry i did it on the rain day we had 2 days later. Next step putting the timbers on the re-bar and planting new plants :c).

Monday, October 22, 2007

My New Project..AN ARK

So for some odd reason while the rest of the country is having rabid forest fires (south California), droughts, and back in SC water restrictions, We here in New Orleans are taking on water. I checked the weather last night to see if it was going to rain because i was going to finish my landscaping timber project today on my day off. Well it said something like "scattered showers". They lied....It began raining this morning and has not stopped since, Urban Flooding is so bad by our house that i had to walk through 1/2 ft. of water on the sidewalk going to the Circle K just down the street. Lucky for me I have my Crocs (i used to hate them when people would wear them, but they are just SOO useful). Poor Bella the dog had to go potty on the cement because all the grass had at least 3in of water on it. When i find my camera PC cord i will post a video of my walk to the circle K....Pray for the people in the city because Sarah and I live in one the highest parts of the city. Most of the girls schools have been canceled because of flooding, i guess part of the "charm of the city" is all the water we get to experience. I should get my Kayak from the storage unit and go for a "paddle"...Ahhh the joys of New Orleans.

Thursday, October 18, 2007

Landscaping the yard

I didn't feel the need to talk about mowing the lawn anymore because it was not a challenge anymore...Ive got it down to about 35 min...including blowing the grass off the sidewalk..However i did do something new...I "trimmed" the tree in the front yard...Turns out i have a Japanese Yew...I found this out as i was trimming it and our paster walked by (isn't New Orleans Great!) He told me that he is lucky enough to have the largest one in our neighborhood. Too bad for him i have the largest live Oak...which are much cooler. Anyways..he told me the name and i forgot it of course..so i took a trimming and fruit sample inside and looked it up...He was right, Japanese Yew. Well the trimming didn't turn out so good for the tree...but they grow back i hear :c). Sorry Mike!

I Began the process of replacing the landscaping timber in the front garden. I began by pulling off the old rotten pieces and i met lots of new friends, Worms, Skinks, and lots of slugs (the girls call them leaches and run away from them). It was a bigger job than anticipated...as always. Sarah came home so i got a decent stopping point and cleaned up the yard (i had pieces of wood EVERYWHERE....

Sunday, September 30, 2007

New Light in Living room...Stringing cable..restringing phone

Today i took down the light in our living room and i rewired the new light fixture that sarah and i picked out up by connecting the white to white, black to black and gold to gold (gold is a new one for me). So now we have a new light fixture in the living room...We also have a new one to put up in the bedroom...but thats for another day.
Friday i decided to restring the cable cord so that it was not strung across the room anymore. So i drilled a hole next to the hole a drilled for the Fax phone cord and...WOOOPS...i snapped the fax phone cord in half...so then my new priority was restringing the Fax cord..cuz hello...we are running a business here and get lots of Faxes...Matt made a boo boo. Well i restrung the Fax line then strung the cable cord...YEAY MATT...All boo boo's fixed and i accomplished something.

Sidewalk

Hey Kelly...Watch out for the hole!!! (when Kelly visited us she kept tripping in this hole in the sidewalk where grass had grown up in it and you did not see how deep it was).
Haha not anymore...the last few days I've been planning my first concrete laying experience. I measured how big the rectangle was that i was going to pull the broken concrete out of and pour new concrete. It was 60x40...so I've seen people pour concrete...they have a wooden rectangle made from 2x4's and they pour the concrete in them. So i made a rectangle too....I subtracted the 2x4's from the 60x40 measurements and made my rectangle...then i bought a 2 bags of concrete, the 2nd one just encase i needed a little extra to fill the hole. I decided after looking at the broken concrete that about 1/3 of the rectangle was in pretty good shape other than a crack through the middle...so i decided to leave it be. I took the broken concrete out of the hole and dug out a 3-4 in rectangular hole. Then i checked the weather report to look for 3 days in a row of sun so the rain will not ruin the setting of the concrete. Turns out Saturday was a great day to do it :c). So i poured 2 bags in and said UT OH...cuz it bairly filled the hole...So i ran inside asked Sarah for my wallet and Drove off to Lowe's...Meeting a train with 59 cars that i got to watch on the way back...GREAT!! So this time i bought 3 bags...the 3rd bag of course was just in case i need a little more. Well i get home pour in 2 bags and find i needed the 3rd one....I poured it in (5th bag) and found i was going to need 1 more....I didn't have time to go back to Lowe's before it set so i decided to put the Broken Concrete pieces in and see if that helped....Well i took me walking up and down Magazine looking for random pieces of rock or brick but i finally finished the sidewalk :c). Then the we heard the all the girls in the front room at 10:30pm (1 hour after lights out) and had to go give consequences for being up after lights out and being in other rooms...Push over Matt let the girls come out and sign their name in the wet cement after they write their point down. The girls do not have writing in cement ediqute and ended up making the sidewalk look kind of ugly...but i made it and they signed it...so all is well. Pictures to come.

Wednesday, September 26, 2007

Bathroom Fan

On Monday while Sarah was at School i decided to replace the bathroom exhaust fan, because the fan did not work. Felt like a good reason to replace it. Anyways for those of you that have never installed an exhaust fan it turns out to be fairly difficult. The idea is simple...Connect 3 wires on the fan to 3 wires in the celing. The hard part comes in when you try to take out the old fan that has been in the celing for 30 years or more with 30 year old wires and nails. About 2 hours later i had the old fan out and i looked up into the hole and found that there is only one stud going along the side of the opening, making it hard to sucure the fan in the hole. That might be why it was so hard to get the old one out (someone put it in really good). well i ended up connecting a hook about 3 feet up into hole and strung picture hanging wire down and "hung" the exhaust fan out of the celing. It doesnt look great but it works...Pictures to come!

Saturday, September 22, 2007

2nd Stay at the Oshner Hotel

My second stay was more miserable than the 1st stay. My 1st stay atleast had the first time wonders with it...WOW THERES A CAMERA IN HERE.....WOW AN INTERCOM....WOW THIS IS A COOL HOSPITAL....I GET TO WEAR THIS ODD MASK....Anyways this time i didn't get the pre-sleep dvd about sleep disorders....The Brewers won (chasing my Cubs in the NL Central)...and they told me i was going to wear the mask the whole night....I begin my evening by telling my personal assistant that i can not sleep on my back....to which she tells me that in order to wear the mask i have to be on my back....So i was optimistic about the night...maybe this time i can sleep with this crazy machine...Well she straps it on and i tell her it is too tight...Okay she says and "loosens it"....It still hurts i tell her...Oh you will get used to it she tells me...GREAT...Well about 2 hours in i could not stand the pain anymore and i buzzed her...I tell her to take it off I'm better off without it. So she takes it off...for 2 minutes... then comes and straps it on again. So much for sleep. I finally got to leave about 6:30am and i went home, gave my wife a kiss, and rolled over on my stomach so i could sleep, and off i was to dream land...Oh by the way..its 6:00pm and i still have the marks from the mask on my face and my nose still hurts...I told that lady it was too tight! Life goes on :c)